全國24小時熱線電話:

159-0541-3928(點擊撥打)

您現在的位置:首頁新聞中心教大家升降機拆卸步驟
推薦產品

Similar products

教大家升降機拆卸步驟

1、首先將圍欄系統和限位拆除,將副鋼絲繩拆除,將一邊吊籠拆除,將帶有天窗一邊的吊籠部件拆除,在吊籠框內用抱箍等把吊桿緊固。
Lift manufacturers introduced first fence system and limit removed, the deputy rope removed, the side of the cage removed, the side of the cage with a skylight parts removed, the box in the cage with a hoop and other fastening the boom.

2、其次把平衡鐵架拆除,然后將第一道纜風繩拆除,在頂框邊綁扎一根長1m的腳手架鋼管并掛上一個可吊重量為0.5T~1T的開口滑輪。把導向掄附件安裝于標準節的側上方。
Second, the balance comes to lift manufacturers formwork removal, then the first wind cable rope removed, lashing at the top rim of a long 1m steel scaffolding and hang a weight hanging pulley opening of 0.5T ~ 1T. The guide picked

accessory mounted on the upper side of the standard section.

3、再拆除曳引鋼絲繩,拆掉曳引輪,裝上拆卸卷筒,將拆卸鋼絲繩從卷筒引出,經過導向輪,頂滑輪后向下,中部系緊于吊桿的內下桿處,末端從吊桿滑輪處引出。
Lift manufacturers say then remove the traction rope, removed the traction wheel, mounted on the reel demolition, the removed the rope from the drum leads, through the guide wheel, pulley after top-down, central lacing on the next shot at the boom , drawn at the end of the boom pulley.

4、最后將標準節逐一拆除,當拆到纜風繩時,要先將纜風繩拆除后方可拆卸標準節,將曳引機構及基礎節拆除。
Lift manufacturers introduced one by one and finally the standard section removed, when split to wind cable rope, first dismantle the wind cable rope standard removable rear section, the traction mechanism and the basis of section

removed.

上一篇:升降貨梯儲罐簡介        下一篇:升降貨梯液壓部件工作原理
聯系我們:
 
聯系人:王經理
 
熱線:159-0541-3928
 
網 址:www.38jp.cn
 
郵 箱:jntrjixie@163.com
 
地址:山東省濟南市濟陽區濟陽街道工業園15-4號
微信二維碼:

掃描二維碼 溝通洽談
短信 電話

請長按保存二維碼后點擊確定按鈕,進入微信掃一掃界面,點擊右上角‘相冊’選擇我們的二維碼,再點擊右上角‘完成’識別添加。
(為防止瀏覽器錯誤識別,請勿直接在瀏覽器中識別二維碼)

確定
人人玩人人添人人澡mp4_99se亚洲综合在线_日本少妇被黑人粗大的猛激进_自偷自拍亚洲综合精品